Engineering Mission-Critical Power Infrastructure for a Hyperscale Data Centre

Off-Grid Prime Power Energy Centre

Overview

Located in Dublin, this hyperscale data centre campus has a site load of up to 160MW across 4 data centre buildings.

The facility includes a dedicated CCGT Energy Centre comprising 10 No. Gas Turbines and 2 No. Steam Turbines, delivering a combined 200MW. All generation is connected via individual step-up transformers to a complex 33kV network designed for maximum redundancy.

NeoDyne scope included:

Customer Requirements

Dublin’s constrained electricity grid presents significant challenges for the development of new hyperscale data centres, where uninterrupted power is essential.

The Energy Centre needed to:

Project at a glance

NeoDyne delivered key infrastructure for an advanced 200MW Energy Centre supplying prime power to a hyperscale data centre in Dublin, including 33kV Network, Natural Gas Pressure Regulating Station, and Control & Protection Systems integrating the entire balance of plant for the system, across Electrical & Mechanical BOP and Off-Grid (Island Mode) generator controls.

Site Generation

200 MW



Data Centre

4

Gas Turbines

10 x Solar T130

Steam Turbines

2 x Siemens SST-300

Voltage

33 kV Private Network

Control System

Siemens S7-1500 with
WinCC OA SCADA


NeoDyne's Engineering Solution

Electrical
Infrastructure

Design and delivery of the complete high-availability electrical distribution network.

Scope included:

Control &
Automation

Integrated control of the complete Energy Centre.

Features:

Power
Generation

Intelligent control of all generation assets.

Capabilities:

Mechanical
Systems

Integrated control and commissioning of mechanical systems.

Included:

System Architecture

Integrated Energy Centre Architecture

At the heart of the Energy Centre is NeoDyne’s integrated control and power management architecture, bringing together electrical distribution, mechanical Balance of Plant services and power generation into a single resilient operating platform.

The Plant Control System continuously coordinates gas turbines, steam turbines, diesel generators, the Natural Gas PRMS and the 33 kV private electrical network, enabling intelligent load sharing, generator synchronisation, black start capability and island mode operation. Designed with no single point of failure, the architecture delivers the resilience, availability and operational flexibility required to provide continuous prime power to a mission-critical hyperscale data centre.

Project Outcomes

Reliable Power Distribution

Robust architecture ensures secure delivery of power from generation to the data centres

Fully Redundant operation

No single point of failure – anywhere

Optimised Performance

Automated Power Management enhances efficiency & minimises operation cost.

Mission-Critical Protection

Comprehensive protection ensures safe and stable operation under all conditions

Future Ready design

Scalable and flexible system architecture supports future power and data hall expansion.

End-to-End Delivery

NeoDyne provides complete design, supply and commissioning for a turnkey solution.

Why NeoDyne?

NeoDyne delivers the engineering expertise behind resilient, mission-critical power infrastructure.

Our multidisciplinary teams combine electrical engineering, protection, automation, SCADA and power generation expertise to design, deliver and commission integrated power management solutions for the world’s most demanding data centre environments.

Other Case Studies